![]() ![]() ![]() changed its name to Ameron International Corporation, and Ameron HC&D followed with a name change to Ameron Hawaii for the next 18 years.Īfter 47 years of mainland corporate ownership, in 2014, Ameron Hawaii returned to local ownership and returned to our 1908 roots by changing our name back to HC&D as tribute to our original name.WAILUKU > Kahului Airport is getting upgrades that officials hope will boost tourism as the economy-driving sugar industry is phased out of production. and became officially known as Ameron HC&D. For many years, Ameron and HC&D supplied concrete pipe to many of Hawaii's major water transmission lines and sewage systems as a joint venture. ![]() of Monterey Park, California (Ameron, Inc.). In late 1967, HC&D became a wholly owned subsidiary of American Pipe and Construction Co. The company produces the majority of aggregate for subbase preparation, ready-mix concrete and asphaltic concrete, and has met market demands with capital improvements to increase production capacities. The present quarry is the second site in the Kapaa area and covers approximately 416 acres. In 1932, a moving and storage division was formed with quarrying and ready-mix concrete remaining the major business operation.ĭuring the 1930's and 1940's, quarries were located in Palolo and Moiliili, but in 1949, rock production moved to the Kapaa Quarry site due to increasing suburban development. In the business community, the company became known as HC&D. The base of the business was the draying of construction materials by horse-drawn wagons. was formed in 1908 by a quarry owner, three construction men, and a retired sea captain. Honolulu Construction & Draying Co., Ltd. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |